Nestworks

Kitchen renovation: 12 ideas and a step-by-step plan

How to turn an old kitchen into a modern, easy-to-clean workspace.

Renovated white kitchen with a marble breakfast island, bar stools, aqua backsplash and lit display shelves

A kitchen renovation is one of the most rewarding upgrades in an older home. Many Indian kitchens still have a cement slab with open shelves below, tiles up to half the wall and no chimney. A renovation brings storage, light, ventilation and easy cleaning.

Here are 12 kitchen renovation ideas and a step-by-step plan.

Dark gloss kitchen with a skylight, grey stone backsplash and under-cabinet LED strip lighting

01Replace slab with modular cabinets

Remove open shelves and fit modular base cabinets on a new counter.

Room under renovation with a bare white wall marked for diagonal tiles, exposed pipes and a new wooden floor

02New granite or quartz counter

A new counter with sink and hob cut-outs.

Renovated pantry and dining space with a wooden slatted ceiling, walnut-and-grey cabinets and a long dining table

03Full-height tiles

Tile the full wall for easy cleaning.

Home renovation in progress: new wooden ceiling slats, covered kitchen island, arched niche and ceiling fan

04Chimney with ducting

Add a chimney and duct outside to remove smoke.

Freshly renovated empty flat with white walls, built-in niche shelves, laminate wood floor and a white kitchen

05New plumbing

Replace old pipes and add a water purifier point.

06Rewiring

New sockets for appliances on proper circuits.

07Tall pantry unit

Floor-to-ceiling storage for groceries.

08Better lighting

Panel lights and under-cabinet LEDs.

09New flooring

Anti-skid vitrified tiles over old floors.

10Window upgrade

UPVC windows with mesh for ventilation.

11Utility area

Move washing and storage to the balcony.

12Breakfast counter

Open up a wall for a counter if structure allows.

Renovating an old kitchen as part of a bigger update? See our home renovation in Kolkata service.

Kitchen renovation steps

  1. Plan layout and appliances.
  2. Demolish old slab, tiles and shelves.
  3. Plumbing and electrical changes.
  4. Civil work: new platform base if needed, floor and wall repairs.
  5. Tiling.
  6. Install cabinets, counter, sink, hob and chimney.
  7. Lighting and finishing.

Kitchen remodel cost depends on size, layout, materials and how much civil and plumbing work is needed.

Materials and rough cost factors

  • Demolition and civil work.
  • Cabinets: BWP ply carcass, shutter finish, hardware.
  • Counter: granite or quartz.
  • Appliances: chimney, hob.
  • Plumbing, electrical and tiles.

FAQs

Frequently asked questions

How long does a kitchen renovation take?+

It depends on the civil and plumbing work; we confirm the schedule in writing before starting.

Can I keep my old granite slab?+

Sometimes, if it's in good condition and suits the new layout.

What affects kitchen renovation cost?+

Size, layout, cabinet materials, counter, appliances, and the amount of civil and plumbing work.

Can I use my kitchen during renovation?+

Usually not for a full renovation. Plan a temporary cooking setup.

Ready to plan your home?

Book a free consultation with a designer. No obligation, no pressure.

CallWhatsAppGet Quote